The CP DB1 transformer discharge box facilitates fast discharging of power transformers after a test of the winding resistance.
A transformer must be discharged whenever the measurement of one phase has been completed. Thus customers can save a lot of time by measuring with the CP DB1.
Key features
» In 6 A operating mode the CP DB1 speeds up the discharging process by a factor of four
» In 100 A operating mode the CP DB1 speeds up the discharging process by a factor of ten
Applications
» Faster discharging of power transformers after a test of the winding resistance
» Testing with the RWinding and TRTapCheck (for OLTC) test cards
| |